Ready for Inspections
It’s been a busy couple of days at my garage-becomes-living-space project. We’ve had a flurry of activity in preparation for the rough-in inspections. These are the inspections that take place before the insulation and drywall are installed. At this project, we’ll have both a building and electrical inspection.
John Dorn handled the electrical work for me. He installed outlets all the way around the room as well as a outdoor light and outlet at the back door and lights in the two closets. We also relocated the room light in the center of the room and wired it for a ceiling fan. John was great to work with. If you need an electrician, check out his website at www.JohnDornElectric.com.
I also took the time to attach furring strips all around the room to the block wall that extends up the first 16″. For this I used 3/4″ plywood because it’s less likely to split than a board would be. I attached them using my Ramset gun and 1 1/2″ fasteners. This took a slightly less powerful ‘load’ than what I used to install the fasteners in the solid cement floor.
I’m ready for insulation… just need that inspection first…